• uni logo

QS Rank:

verified

206

uni logo

Queens University of Belfast

flag

Belfast

United Kingdom

The UK's growing electricity needs (from electric vehicles, data farms, etc.) and commitment to decarbonisation are driving a shift to the deployment of large offshore floating wind farms. A major challenge is that these turbines are not decoupled: the turbulent downstream wind generated by each turbine — the notorious wake effects — can have a negative impact on other turbines. Wake effects can reduce the turbines’ productivity and generate undesirable vibrations that accelerate their wear and tear and lead to failures. In this project we will devise advanced control algorithms to address these challenges.
intake

Duration

3 Months

Ranking

icon

#295

US World and News Report

icon

#198

The World University Rankings

icon

#206

QS World University Rankings

Class Profile

Application Requirements

Here's everything you need to know to ensure a complete and competitive application—covering the key documents and criteria for a successful submission.

    • intake

      Master SOP

    • intake

      Academic LOR

    • intake

      Cover Letter

    Application Deadlines

    Default
    summerJun 1, 2025

    Ready to elevate your study abroad journey?

    Book a call with us now and take the first step towards your global future!

    Connect with us on our social media

    • icon
    • icon
    • icon
    • icon